Blog

WA State Gas Meter Clearance

Gas Meter Clearance Pamphlet

Builder/owner/developer requirements

  • The clearances in this handout also apply to features on buildings adjacent to the building where the gas meter is located.

  • The final grade of the service line route must be in place before the service line can be installed.

  • If you are unable to meet the meter location requirements in this handout, contact PSE for further assistance.

  • Puget Sound Energy reserves the right to designate gas meter locations so that they comply with PSE standards.

  • For gas meter installations in Cle Elum and west of Cle Elum within Upper Kittitas County, see the Gas Meter Protection from Snow and Ice in Snow Country handout (form 3736).